← The Longview Wire
Infrastructure

US 12 Bridge Repairs Cause Nightly Closures

πŸ”Š Listen Β· narrated by Aiden

US 12 over I-5 will close one lane nightly from 7:30 p.m. Monday, Aug. 10, to 6 a.m. Thursday, Aug. 20, for bridge repairs, according to WSDOT. Drivers must follow a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.

The closure affects travelers crossing I-5 near milepost 66.5. WSDOT advises slowing down and expecting delays. The detour is in place until Aug. 20, when the repairs conclude.

WSDOT's travel advisory specifies that flaggers will direct traffic during the nightly closures. The repairs are part of ongoing bridge maintenance on US 12.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 13 claims supported Β· 31%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • βœ“
    US 12 over I-5 will close one lane nightlyβ€œFrom 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • ⚠
    The closure starts on Monday, Aug. 10No usable supporting receipt β€” unverified.
  • ⚠
    The closure ends on Thursday, Aug. 20No usable supporting receipt β€” unverified.
  • ⚠
    The closure is for bridge repairsNo usable supporting receipt β€” unverified.
  • βœ“
    Drivers must follow a signed detour using northbound I-5β€œTravelers who need to cross the freeway will follow a signed detour.”
  • ⚠
    Drivers must take Exit 71 for SR 508No usable supporting receipt β€” unverified.
  • ⚠
    Drivers must then take southbound I-5 back to US 12No usable supporting receipt β€” unverified.
  • ⚠
    The closure affects travelers crossing I-5 near milepost 66.5No usable supporting receipt β€” unverified.
  • βœ“
    WSDOT advises slowing down and expecting delaysβ€œSlow down, stay focused and expect delays.”
  • ⚠
    The detour is in place until Aug. 20No usable supporting receipt β€” unverified.
  • ⚠
    When the repairs conclude, the detour will endNo usable supporting receipt β€” unverified.
  • βœ“
    Flaggers will direct traffic during the nightly closuresβ€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • ⚠
    The repairs are part of ongoing bridge maintenance on US 12No usable supporting receipt β€” unverified.

The Longview Wire is free. Get Longview's news delivered every morning.