US 101 between the SR 4 interchange and Fowler Street will experience slowdowns and delays each day from 6:30 a.m. to 3:30 p.m. on Oct. 7 and Oct. 8, according to WSDOT. The work involves mowing along the highway and will affect both directions of traffic during those hours.
US 101 Mowing Work Causes Delays Oct. 7-8
🔊 Listen · narrated by Aiden
📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported · 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗
- ✓US 101 Mowing Work Causes Delays Oct. 7-8“101 [48 mi from Longview]: Wednesday, Oct. 7 and Thursday, Oct. 8: Travelers in both directions of US 101 between the SR 4 interchange (milepost 28) and Fowler Street (milepost 58) will encounter slowdowns and delays each day from 6:30 a.m. to 3:30 p.m., for mowing along the highway.”
- ✓US 101 between SR 4 and Fowler Street will have slowdowns from 6:30 a.m. to 3:30 p.m. on Oct. 7 and 8, WSDOT says.“Wednesday, Oct. 7 and Thursday, Oct. 8: Travelers in both directions of US 101 between the SR 4 interchange (milepost 28) and Fowler Street (milepost 58) will encounter slowdowns and delays each day from 6:30 a.m. to 3:30 p.m., for mowing along the highway.”
- ✓US 101 between the SR 4 interchange and Fowler Street will experience slowdowns and delays each day from 6:30 a.m. to 3:30 p.m. on Oct. 7 and Oct. 8, according to WSDOT. The work involves mowing along the highway and will affect both directions of traffic during those hours.“Wednesday, Oct. 7 and Thursday, Oct. 8: Travelers in both directions of US 101 between the SR 4 interchange (milepost 28) and Fowler Street (milepost 58) will encounter slowdowns and delays each day from 6:30 a.m. to 3:30 p.m., for mowing along the highway.”
Source text saved for this check (2026-10-08T12:47:51.782Z)
WSDOT highway construction and road closures within 50 miles of Longview — 10/8/2026: 101 [48 mi from Longview]: Wednesday, Oct. 7 and Thursday, Oct. 8: Travelers in both directions of US 101 between the SR 4 interchange (milepost 28) and Fowler Street (milepost 58) will encounter slowdowns and delays each day from 6:30 a.m. to 3:30 p.m., for mowing along the highway. Travelers are reminded to slow down, stay focused and have patience through the work zone. Effective: Oct 7, 2026, 5:00 AM Expected end: Oct 8, 2026, 3:30 PM
The Longview Wire is free. Get Longview's news delivered every morning.