WSDOT began alternating traffic through one lane on SR 504 both directions at milepost 19.24 near Kid Valley on Oct. 15, 2026, starting at 9:28 a.m. The lane alternation will continue until further notice, with drivers urged to use caution through the work zone.
SR 504 lane alternation begins Oct. 15
🔊 Listen · narrated by Aiden
📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported · 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗
- ✓SR 504 lane alternation begins Oct. 15“504 [23 mi from Longview]: Construction on SR 504 both directions at milepost 19.24 near Kid Valley, traffic will be alternated through one lane, use caution, beginning at 9:28 am on October 15, 2026 until further notice.”
- ✓WSDOT begins alternating traffic on SR 504 near Kid Valley starting Oct. 15, 2026, for construction work.“504 [23 mi from Longview]: Construction on SR 504 both directions at milepost 19.24 near Kid Valley, traffic will be alternated through one lane, use caution, beginning at 9:28 am on October 15, 2026 until further notice.”
- ✓WSDOT began alternating traffic through one lane on SR 504 both directions at milepost 19.24 near Kid Valley on Oct. 15, 2026, starting at 9:28 a.m. The lane alternation will continue until further notice, with drivers urged to use caution through the work zone.“504 [23 mi from Longview]: Construction on SR 504 both directions at milepost 19.24 near Kid Valley, traffic will be alternated through one lane, use caution, beginning at 9:28 am on October 15, 2026 until further notice.”
Source text saved for this check (2026-10-15T18:51:28.604Z)
WSDOT highway construction and road closures within 50 miles of Longview — 10/15/2026: 504 [23 mi from Longview]: Construction on SR 504 both directions at milepost 19.24 near Kid Valley, traffic will be alternated through one lane, use caution, beginning at 9:28 am on October 15, 2026 until further notice. Effective: Oct 15, 2026, 9:28 AM 012 [28 mi from Longview]: From 7:30 p.m. Monday, Aug. 10, and continuing weeknights from 7:30 p.m. to 6 a.m.: Travelers in both directions of US 12 between I-5 (milepost 66.5) and Kennedy Road (milepost 77.4) will take turns moving through one open lane at a time for paving and bridge joint repair work. Flaggers will direct travelers to follow a pilot car through the work zone. Plan ahead and expect delays of up to 20 minutes in each direction. Effective: Aug 12, 2026, 12:00 PM 012 [29 mi from Longview]: Monday, Oct. 12 to Sunday, Oct. 20: Travelers in both directions of US 12 will encounter intermittent daytime delays between South Prairie Road (milepost 69.5) and Kennedy Road (milepost 77.1), from 10 a.m. to 6 p.m., for lane striping work. Travelers should slow down, stay focused and have patience when traveling through the work zone. Effective: Oct 12, 2026, 5:00 AM Expected end: Oct 20, 2026, 6:00 PM 004 [33 mi from Longview]: Maintenance on SR 4 westbound from milepost 20.2 near Fossil Creek to milepost 20.5, Crew will be alternating traffic through a single lane with automatic (robo) flaggers for a vegetation brushing operation. Use caution and expect delays beginning at 7:28 am on October 15, 2026 until further notice. Effective: Oct 15, 2026, 7:28 AM 006 [34 mi from Longview]: Monday, Sept. 14 through Friday, Oct. 16: Travelers in both directions of SR 6 will take turns moving through a single lane between Clinton Road (milepost 45.6) and Twin Oaks Road (milepost 46.5), weekdays from 7 a.m. to 3:30 p.m., for work to replace a buried water main line. Flaggers will direct travelers through the work zone. Plan ahead and expect delays. This work is being done by Boistfort Valley Water Corporation. Effective: Sep 14, 2026, 5:00 AM Expected end: Oct 16, 2026, 3:30 PM 014 [44 mi from Longview]: Construction on SR 14 westbound at milepost 9.7 near 192nd Avenue Exit 10 will have the right shoulder of the westbound offramp closed for core sampling, use caution beginning at 7:55 am on October 15, 2026 until further notice. Effective: Oct 15, 2026, 7:55 AM
The Longview Wire is free. Get Longview's news delivered every morning.