The left lane of the eastbound SR 500 off-ramp to Northeast 112th Avenue/Gher Road will close for overhead sign bridge inspections.
SR 500 off-ramp lane closed for inspections
🔊 Listen · narrated by Aiden
📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts3 of 3 passages supported · 100%
Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗
- ✓SR 500 off-ramp lane closed for inspections“The left lane of the eastbound SR 500 off-ramp to Northeast 112th Avenue/Gher Road (mileposts 4.8 to 5.4) will close for overhead sign bridge inspections.”
- ✓Left lane of eastbound SR 500 off-ramp to Northeast 112th Avenue/Gher Road closed Sunday, Oct. 25, from 11 a.m. to 2 p.m.“500 [38 mi from Longview]: From 11 a.m. to 2 p.m., Sunday, Oct. 25: The left lane of the eastbound SR 500 off-ramp to Northeast 112th Avenue/Gher Road (mileposts 4.8 to 5.4) will close for overhead sign bridge inspections.”
- ✓The left lane of the eastbound SR 500 off-ramp to Northeast 112th Avenue/Gher Road will close for overhead sign bridge inspections.“The left lane of the eastbound SR 500 off-ramp to Northeast 112th Avenue/Gher Road (mileposts 4.8 to 5.4) will close for overhead sign bridge inspections.”
Source text saved for this check (2026-10-25T18:50:56.674Z)
WSDOT highway construction and road closures within 50 miles of Longview — 10/25/2026: 500 [38 mi from Longview]: From 11 a.m. to 2 p.m., Sunday, Oct. 25: The left lane of the eastbound SR 500 off-ramp to Northeast 112th Avenue/Gher Road (mileposts 4.8 to 5.4) will close for overhead sign bridge inspections. Travelers should slow down, stay focused and move over for crews working along the highway. Effective: Oct 25, 2026, 10:00 AM Expected end: Oct 25, 2026, 2:00 PM
The Longview Wire is free. Get Longview's news delivered every morning.