Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
WSDOT announced multiple highway closures affecting Longview, WANo usable supporting receipt β unverified.
- β
Highway closures will start this weekNo usable supporting receipt β unverified.
- β
Southbound I-405 will close from milepost 12 to Coal Creek Parkway Southeast (milepost 10)β405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 β 5 a.m. Friday, Sept. 4.β
- β
The closure of Southbound I-405 will be overnight Thursday, Sept. 3β405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 β 5 a.m. Friday, Sept. 4.β
- β
The closure of Southbound I-405 will end on Friday, Sept. 4β405: Up to two lanes of southbound I-405 from milepost 12 to Coal Creek Parkway Southeast (milepost 10) will be closed overnight, 9 p.m. Thursday, Sept. 3 β 5 a.m. Friday, Sept. 4.β
- β
Northbound I-405 will close from Northeast 85th Street on-ramp to Northeast 100th Streetβ405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 5 a.m. Monday, Aug. 31. A signed detour will be in place.β
- β
The closure of Northbound I-405 will start from 11 p.m. Friday, Aug. 28β405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 5 a.m. Monday, Aug. 31. A signed detour will be in place.β
- β
The closure of Northbound I-405 will end on 5 a.m. Monday, Aug. 31β405: Up to three lanes of northbound I-405 will close from the Northeast 85th Street on-ramp to Northeast 100th Street from 11 p.m. Friday Aug. 28 to 5 a.m. Monday, Aug. 31. A signed detour will be in place.
Effective: Aug 24, 2026, 12:00 AM
Expected end: Aug 31, 2026, 5:00 AMβ
- β
I-5 will see single-lane reductions nightly from 8 p.m. to 5 a.m.β005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.β
- β
Single-lane reductions on I-5 will last through Sept. 4β005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.β
- β
Single-lane reductions on I-5 will be near Alger/Lake Samish Road (exit 240)β005: The northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.β
- β
Single-lane reductions on I-5 will be north of North Lake Samish (exit 246)β005: The left lane of northbound I-5 will close from 8 p.m. to 5 a.m. nightly Sunday, Aug. 30, through Friday morning, Sept. 4, north of North Lake Samish (exit 246) for fish passage construction.β
- β
The single-lane reductions on I-5 are for fish passage constructionβThe northbound and southbound I-5 will be reduced to a single lane from 8 p.m. to 5 a.m. nightly Monday, Aug. 31, through Friday morning, Sept. 4, near Alger/Lake Samish Road (exit 240) for fish passage construction.β
- β
SR 4 will have a single lane closed weekdays from 7:30 a.m. to 5 p.m.β004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.β
- β
The single lane closure on SR 4 will be between 50th and 42nd Avenuesβ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.β
- β
The single lane closure on SR 4 will last until Sept. 11β004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.β
- β
The single lane closure on SR 4 is for gas main workβ004: Monday, Aug. 17 through Friday, Sept. 11: A single lane in both directions of SR 4 between 50th Avenue (milepost 56.4) and 42nd Avenue (milepost 57.2) will be closed weekdays from 7:30 a.m. to 5 p.m., for buried gas main line extension work.β
- β
SR 99 will close the right lane from Russell Way to Gibson Roadβ099: From 8 p.m. Monday, Aug. 31 to Tuesday, Sept. 1, the right lane of State Route 99 from Russell Way/North Manor Way to Gibson Road (milepost 51) will close for utilities work.β
- β
The closure of the right lane on SR 99 will start on Aug. 31β099: From 8 p.m. Monday, Aug. 31 to Tuesday, Sept. 1, the right lane of State Route 99 from Russell Way/North Manor Way to Gibson Road (milepost 51) will close for utilities work.β
- β
The closure of the right lane on SR 99 will end on Sept. 1β099: From 8 p.m. Monday, Aug. 31 to Tuesday, Sept. 1, the right lane of State Route 99 from Russell Way/North Manor Way to Gibson Road (milepost 51) will close for utilities work.
Effective: Aug 28, 2026, 10:57 AM
Expected end: Sep 1, 2026, 5:00 AMβ
- β
The closure of the right lane on SR 99 is for utilities workβ099: From 8 p.m. Monday, Aug. 31 to Tuesday, Sept. 1, the right lane of State Route 99 from Russell Way/North Manor Way to Gibson Road (milepost 51) will close for utilities work.β