← The Longview Wire
Infrastructure

Longview Road Closures Impact Travel

πŸ”Š Listen Β· narrated by Aiden

Multiple road closures and lane restrictions begin this week for repairs and construction in Longview. The Washington State Department of Transportation (WSDOT) has announced several temporary changes to local highways and roads effective August 18, 2026.

WSDOT will close one general-purpose lane of eastbound SR 522 from Campus Way Northeast to 131st Avenue Northeast nightly from 8 p.m. on August 18 until 4:30 a.m. on August 21. A single lane of US 12 over I-5 will close nightly for bridge repairs from August 10 to August 20. Additionally, multiple lanes on I-405 and SR 508 will be closed or restricted during specific time frames.

Travelers should expect delays and follow signed detours. The US 12 closure requires using a detour via northbound I-5 to Exit 71 for SR 508, then southbound back to US 12. The SR 9 closure south of Mount Vernon Big Lake Road will remain in place until 6 a.m. on August 19.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts11 of 14 claims supported Β· 79%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    Multiple road closures and lane restrictions begin this week for repairs and construction in LongviewNo usable supporting receipt β€” unverified.
  • βœ“
    The Washington State Department of Transportation (WSDOT) has announced several temporary changes to local highways and roads effective August 18, 2026β€œWSDOT statewide highway construction and road closure updates β€” 8/18/2026:”
  • βœ“
    WSDOT will close one general-purpose lane of eastbound SR 522 from Campus Way Northeast to 131st Avenue Northeast nightlyβ€œ405: One general-purpose lane of eastbound SR 522 from Campus Way Northeast (milepost 10.4) to 131st Avenue Northeast (milepost 11.4) will be closed nightly from 8 p.m. Tuesday, August 18 to 4:30 a.m. Friday, August 21.”
  • βœ“
    The closure of the eastbound SR 522 lane will start on August 18β€œ405: One general-purpose lane of eastbound SR 522 from Campus Way Northeast (milepost 10.4) to 131st Avenue Northeast (milepost 11.4) will be closed nightly from 8 p.m. Tuesday, August 18 to 4:30 a.m. Friday, August 21.”
  • ⚠
    The closure of the eastbound SR 522 lane will end on August 21No usable supporting receipt β€” unverified.
  • βœ“
    The closure of the eastbound SR 522 lane will be from 8 p.m. to 4:30 a.m.β€œ405: One general-purpose lane of eastbound SR 522 from Campus Way Northeast (milepost 10.4) to 131st Avenue Northeast (milepost 11.4) will be closed nightly from 8 p.m. Tuesday, August 18 to 4:30 a.m. Friday, August 21.”
  • βœ“
    A single lane of US 12 over I-5 will close nightly for bridge repairsβ€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    The closure of the US 12 over I-5 lane will start on August 10β€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    The closure of the US 12 over I-5 lane will end on August 20β€œ012: From 7:30 p.m. Monday, Aug. 10 to 6 a.m. Thursday, Aug. 20: A single lane of US 12 over I-5 (milepost 66.5) will close nightly for bridge repairs.”
  • βœ“
    Multiple lanes on I-405 and SR 508 will be closed or restricted during specific time framesβ€œ405: The left express toll lane of northbound I-405 between Northeast 160th Street (milepost 22.61) and SR 527 (milepost 27.1) will be closed nightly from 8:30 p.m. Monday, August 17 to 5 a.m. Friday, August 21. 405: Up to three lanes of southbound I-405 from Coal Creek Parkway Southeast (milepost 9.5) to milepost 7 will be closed nightly, 10:30 p.m. Monday, Aug. 17 – 5:30 a.m. Wednesday, Aug. 19. 508: Construction on SR 508 both directions from milepost 22.68 near Alder Creek to milepost 22.89 near Alder Creek will be alternating traffic with flaggers. Use caution when approaching the area, beginning at 8:32 am on August 18, 2026 until further notice.”
  • βœ“
    Travelers should expect delays and follow signed detoursβ€œTravelers who need to cross the freeway will follow a signed detour. Flaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12. Slow down, stay focused and expect delays.”
  • βœ“
    The US 12 closure requires using a detour via northbound I-5 to Exit 71 for SR 508β€œFlaggers will direct travelers to a signed detour using northbound I-5 to Exit 71 for SR 508, then southbound back to US 12.”
  • ⚠
    The US 12 closure requires using a detour then southbound back to US 12No usable supporting receipt β€” unverified.
  • βœ“
    The SR 9 closure south of Mount Vernon Big Lake Road will remain in place until 6 a.m. on August 19β€œ009: Both directions of SR 9 are closed until 6 a.m. Wednesday, Aug. 19, south of Mount Vernon Big Lake Road (milepost 49) to install a fish passage. Signed detours use SR 534, I-5 and SR 538/College Way around the closure. Please add time to your travel plans.”

The Longview Wire is free. Get Longview's news delivered every morning.