← The Longview Wire
Infrastructure

I-5 lane closure for pavement sampling

🔊 Listen · narrated by Aiden

Up to two lanes of northbound I-5 will close between the North Fork Lewis River Bridge (milepost 19.8) and Exit 21/Woodland, from 5 a.m. to noon, for pavement core sampling.

Travelers should slow down, stay focused and expect delays through the work zone.

📄 Source: WSDOT — Highway Construction & Closures — https://wsdot.wa.gov/travel/road-construction
Source receipts4 of 4 passages supported · 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document ↗

  • ✓
    I-5 lane closure for pavement sampling“Thursday, Oct. 15: Up to two lanes of northbound I-5 will close between the North Fork Lewis River Bridge (milepost 19.8) and Exit 21/Woodland, from 5 a.m. to noon, for pavement core sampling.”
  • ✓
    Northbound I-5 closes Oct. 15 between Lewis River Bridge and Exit 21 for pavement core sampling.“Thursday, Oct. 15: Up to two lanes of northbound I-5 will close between the North Fork Lewis River Bridge (milepost 19.8) and Exit 21/Woodland, from 5 a.m. to noon, for pavement core sampling.”
  • ✓
    Up to two lanes of northbound I-5 will close between the North Fork Lewis River Bridge (milepost 19.8) and Exit 21/Woodland, from 5 a.m. to noon, for pavement core sampling.“005 [20 mi from Longview]: Thursday, Oct. 15: Up to two lanes of northbound I-5 will close between the North Fork Lewis River Bridge (milepost 19.8) and Exit 21/Woodland, from 5 a.m. to noon, for pavement core sampling.”
  • ✓
    Travelers should slow down, stay focused and expect delays through the work zone.“Traveler should slow down, stay focused and expect delays through the work zone.”
Source text saved for this check (2026-10-15T12:45:54.640Z)
WSDOT highway construction and road closures within 50 miles of Longview — 10/15/2026:

005 [20 mi from Longview]: Thursday, Oct. 15: Up to two lanes of northbound I-5 will close between the North Fork Lewis River Bridge (milepost 19.8) and Exit 21/Woodland, from 5 a.m. to noon, for pavement core sampling. 

Traveler should slow down, stay focused and expect delays through the work zone.
Effective: Oct 15, 2026, 4:00 AM
Expected end: Oct 15, 2026, 12:00 PM

012 [28 mi from Longview]: From 7:30 p.m. Monday, Aug. 10, and continuing weeknights from 7:30 p.m. to 6 a.m.: Travelers in both directions of US 12 between I-5 (milepost 66.5) and Kennedy Road (milepost 77.4) will take turns moving through one open lane at a time for paving and bridge joint repair work.

Flaggers will direct travelers to follow a pilot car through the work zone. Plan ahead and expect delays of up to 20 minutes in each direction.
Effective: Aug 12, 2026, 12:00 PM

012 [29 mi from Longview]: Monday, Oct. 12 to Sunday, Oct. 20: Travelers in both directions of US 12 will encounter intermittent daytime delays between South Prairie Road (milepost 69.5) and Kennedy Road (milepost 77.1), from 10 a.m. to 6 p.m., for lane striping work. 

Travelers should slow down, stay focused and have patience when traveling through the work zone.
Effective: Oct 12, 2026, 5:00 AM
Expected end: Oct 20, 2026, 6:00 PM

006 [34 mi from Longview]: Monday, Sept. 14 through Friday, Oct. 16: Travelers in both directions of SR 6 will take turns moving through a single lane between Clinton Road (milepost 45.6) and Twin Oaks Road (milepost 46.5), weekdays from 7 a.m. to 3:30 p.m., for work to replace a buried water main line. 

Flaggers will direct travelers through the work zone. Plan ahead and expect delays. 

This work is being done by Boistfort Valley Water Corporation.
Effective: Sep 14, 2026, 5:00 AM
Expected end: Oct 16, 2026, 3:30 PM

The Longview Wire is free. Get Longview's news delivered every morning.